Road Construction
Whether developing new roads, or upgrading existing ones, each of our road construction projects are held to the highest standards. and include the following:
Vertical/horizontal alignments, pavements, surfacing, road drainage and cross drainage design with services and road furniture installation
‘‘At grade’ intersections including auxiliary and overtaking lanes, roundabouts, right and left slip lanes, and/or line marking
- Field and construction supervision
Boroko Drive – Bava Street – Gavamani/Scratchly Road
Port Moresby, Papua New Guinea
7.7 km, 4-lane urban arterial road. This major part of the southern urban arterial road link in Port Moresby involved widening of existing roads through developed areas and new construction through vacant land.
Moitaka - Gerehu Road
Port Moresby, Papua New Guinea
13 km, 2-lane arterial bypass with new construction through vacant urban corridors.
John Guise Drive
Port Moresby, Papua New Guinea
1.8 km, 4-lane urban arterial road involving the widening of existing roads through developed areas and new construction through vacant land.